Combined Inspection Progress

Offshore workload tracker

View-only mode. to edit.
Inspection OverviewCreated by HM
Total Scope
8
assigned items
Completed
0 / 8
0.0%
In Progress
0
items
Not Started
8
items
Weighted Progress
0.0%
0 / 15 pts

Status per Team

Team 1 (Ut grid)

Hikmat, Asyraf
0/3
  • 2. Helideck Inspection w3Not Started
  • 4. Boatlanding Inspection w3Not Started
  • 5. Pad eye Inspection w2Not Started
Team progress: 0 of 3 done

Team 2 (Timber)

Hadri, Anggara
0/3
  • 6. Cups Inspection w1Not Started
  • 7. Boroscope w2Not Started
  • 8. UT Grid w2Not Started
Team progress: 0 of 3 done

Team 3 (Ut grid)

Nabeel, Alagar
0/2
  • 1. Ad hoc verification w1Not Started
  • 3. Timber Inspection w1Not Started
Team progress: 0 of 2 done

Performance & Workload Analysis

TeamItems DonePoints DoneTarget Points% ProductivityPerformance
Team 10080.0%No Progress Yet
Team 20050.0%No Progress Yet
Team 30020.0%No Progress Yet

% Productivity = (Points Done / Target Points) x 100% ยท Points = sum of weights of completed jobs

Analyst Conclusion

No team has completed any work yet; the entire workload (15 points) is still open. Team 1 carries the heaviest remaining workload at 8 points, including Helideck Inspection, Boatlanding Inspection (weight 3) which are high-risk and weather-dependent, so weather windows and safety support should be prioritised.